Context

Project brief

An investor was carrying out technical due diligence on a portfolio of operating ground-mount solar plants and needed an independent view on one question that site photographs could not answer: are the module mounting structures (MMS) strong enough for the wind they are meant to carry, and if not, what will it take to fix them?

Shirsh Technosolutions screened the MMS of each plant against IS 875 Part 3 wind loads, IS 801 member strength and IS 800 deflection limits, ranked the plants, and proposed a retrofit wherever the structure fell short. For the plant that came out worst, we designed the retrofit and checked it with a full-table FEA in ANSYS Mechanical before anyone touched the site.

The problem

What was at risk

These plants had been running for some years. The site walk-downs had already found misaligned tables, bent posts, missing or loose bracings and corroded sag rods and washers. That told the buyer something was wrong at some sites, but not whether the design itself was adequate or whether the damage was only local.

Solar MMS is light cold-formed steel, and wind governs almost every member. Original design files were not always consistent with what was built, and a structure can look fine on a calm day while its tilt link or rafter is working well beyond its allowable stress under the design gust. For a buyer the stakes are practical. An under-designed table means retrofit steel, site work and a period of risk, and all of that has a price that belongs in the deal discussion.

The team needed, for every plant:

  • a clear acceptable, unacceptable or "to be monitored" call on strength and on deflection

  • the members that govern, and a retrofit that would bring them back within limits

  • an estimate of the extra steel per table, so the retrofit could be costed

Our answer

Solution offered

Plant-by-plant screening. For each plant we built a 3D frame model of a typical table from the as-built details and ran it for dead load with upwind, downwind and side wind. Wind pressures followed IS 875 Part 3 for a mono-slope free roof, with the centre of pressure shifted towards the windward edge rather than a flat uniform load. Member strength was checked to IS 801 with the permitted increase in allowable stress for wind, and deflections were compared with IS 800 limits for each member type. Outer rows, which take the full wind, were checked separately from the sheltered inner rows. The site observation for each plant sat next to the analysis result, so a bent post on site could be read against the member that the model said was overloaded.

Getting the wind right. The panels sit close to the ground, so the basic wind speed at 10 m overstates the load at panel height. We corrected the speed to panel height with a 1/7 power law profile. When the buyer's engineer asked for a re-run on the maximum wind recorded in each plant's daily generation reports, we ran it as a check on past performance and said plainly that a couple of years of plant data is not enough to fix a design wind speed. A long record, at least five years, is needed for that.

Retrofit for the worst plant. At the plant ranked first for action, the tilt links were far beyond their allowable stress and the rafters and purlins deflected well past the IS 800 limits, in both outer and inner rows. We worked through retrofit options and settled on two changes that could be fitted on a running plant:

  • replace the tilt links with front and rear cold-formed channel bracings, forming a Y-type support under the rafter

  • add light angle tie members between the purlins, between columns, to cut the purlin span

Full-table FEA of the retrofit. The retrofitted two-in-portrait table was modelled in ANSYS Mechanical with every column, rafter, purlin, bracing, tie and connection plate, and meshed for a static structural run. Module weight went in as dead load. Upwind and downwind pressures were applied as a varying distribution over the module face, and side wind as member loads. We reviewed total deformation, member-by-member deflection against the IS 800 limits, and equivalent stress in the columns, rafters, purlins, bracings and plates.

What the FEA showed. The new bracings took the load that had overstressed the tilt links and came well inside their strength limit. Purlin deflection came back within its limit once the ties were in. The FEA also showed small residual deflections on the rafter and bracings, and a very small region at the column, rafter and purlin joints above the allowable stress but below yield. We reported both openly and recommended that these tables stay under monitoring after the retrofit. We also listed the extra bracing and tie steel per table, which the buyer used to estimate the retrofit quantity.

Common questions

How do you check if an existing solar mounting structure is safe for wind? Model a typical table with its real sections and connections, apply IS 875 Part 3 wind pressures for a free-standing mono-slope roof at panel height, and check member stresses to IS 801 and deflections to IS 800. Outer rows should be checked separately because they take the full wind.

Can a solar MMS be retrofitted without dismantling the modules? Often yes. Replacing weak tilt links with bolted front and rear bracings and adding tie members to shorten purlin spans can be done on an operating plant. The scheme should be checked on the full table by FEA before site work, so the extra steel actually brings each member within limits.

The hurdles

Challenges we overcame

Operating plants with misalignment, bent posts and corroded parts, where design adequacy and site damage had to be separated

Tilt links and rafters well beyond their allowable limits at the worst plant

Design wind speed corrected from 10 m to panel height with a power law profile

A request to design on a short record of plant wind data, answered with a clear limit on what it can show

A retrofit that had to be fitted on a running plant without taking the modules off

Methodology

How we executed

  1. 1

    Collected as-built table details and site observation reports for each plant

  2. 2

    Built a 3D frame model of a typical table per plant and applied IS 875 Part 3 wind as a mono-slope free roof

  3. 3

    Checked member strength to IS 801 and deflection to IS 800, for outer and inner rows separately

  4. 4

    Rated each plant acceptable, unacceptable or to be monitored, and ranked them for action

  5. 5

    Re-ran the screening on recorded plant wind speeds as a check on past performance

  6. 6

    Iterated retrofit options for the worst plant and chose new bracings plus purlin tie members

  7. 7

    Verified the retrofitted table by static FEA in ANSYS Mechanical under upwind, downwind and side wind

  8. 8

    Reported residual deflections, monitoring advice and retrofit steel per table to the due diligence team

Results

Project outcome

The buyer received a plant-by-plant rating of MMS strength and deflection, ranked for action, during the due diligence window.

The worst plant got a retrofit scheme that brought the overstressed bracing and the purlin deflection back within code limits, proven on the full table by FEA.

Residual deflections and local stress areas were reported plainly, with monitoring advice rather than a blanket pass.

Retrofit steel per table was given so the cost of the fix could be built into the deal discussion.

Visuals

Project gallery

Read more

Related insights

Article

Why Fixed-Tilt Ground-Mount Solar Structures Fail

Fixed-tilt ground-mount is the structure everyone treats as solved. No moving parts, a straight load path from module to rail to post to ground, a static wind check, done. That reputation for simplicity is precisely why these structures fail, not from exotic physics, but from foundations pulled out of the soil, connections detailed for the wrong load direction, slender members that buckled under uplift, and corners that saw far more wind than a borrowed coefficient ever admitted. Walk the load path with a failed array in front of you and the causes are rarely mysterious. Here is how to read the damage, and the analysis chain that would have caught it on paper.

Read
Article

How to Check a Cold-Formed Solar Mounting Structure to IS 801: A Step-by-Step Guide

Most ground-mounted solar structures in India are made from cold-formed steel: thin steel sheet bent into channels and hat sections. Engineers find the wind load from IS 875 Part 3, then check the steel using IS 801. Two mistakes are very common. First, engineers use the full cross-section, but thin steel does not work that way: part of it buckles early, so the code makes you use only the "effective" part. Second, engineers check only the steady (static) load and skip the moving (dynamic) effects. This guide explains both problems in simple steps. It then checks the four main members of a solar structure: post, rafter, bracing, and a 1 mm hat purlin: with full numbers, so you can see exactly where the common shortcuts go wrong.

Read

At a glance

Renewable Energy – Sol
Industry
ANSYS Mechanical
Lead tool
4
Outcomes
8
Steps
Have a similar project?

We apply the same rigour to every engagement

Let us show you what's possible for your product.