Seismic FEA of Dust Cyclones to ASME VIII Div 2 with NBC 2015 Seismic Loads
Seismic FEA of two refractory-lined dust cyclones and an inlet transition in ANSYS, with NBC 2015 seismic loads and ASME VIII Div 2 Part 5 checks.

Project brief
A cyclone equipment maker was supplying two dust cyclones of different sizes and an inlet transition piece for an indoor installation at a process plant in Canada. Fabrication drawings were waiting on one thing: the plant owner wanted the seismic design loads, the centre of gravity for each weight condition, and proof that the support lugs could carry the emergency load. The supporting steel was by others, so the equipment maker needed clear loads to hand over.
Shirsh Technosolutions carried out seismic FEA of the cyclones and the transition in ANSYS Mechanical. Seismic forces were worked out to the National Building Code of Canada (NBC 2015) provisions for equipment, the shell temperature came from a steady-state thermal model, and the stresses were linearised and checked to ASME Section VIII Division 2, Part 5 with Division 1 allowable stresses. When the plant owner's engineers came back with questions and a longer transition, we revised the model and the report the same way.
What was at risk
These cyclones run hot. The gas side is lined with refractory and insulation, so the steel shell sees a temperature well below the gas but still high enough to cut the allowable stress of the plate. Any stress check that ignored this would be optimistic.
Each cyclone hangs from four support lugs around the barrel, and the dust load changes a lot between empty, normal operation and the emergency case given on the drawings. In an earthquake, the lateral force grows with that weight and is carried through the same lugs. The plant owner also asked for the centre of gravity in each condition, so their structural team could design the supports.
The inlet transition added its own problem. Its length was increased during review, and in the shutdown condition it can be held at one flange only, sticking out as a cantilever. The owner wanted to know if the flange and the thin transition shell could carry that.
Solution offered
Seismic loads to NBC 2015. The cyclones and transition were treated as flexible non-structural equipment inside a building. Using the code site data, high importance category and the height of the equipment within the building, we calculated the lateral seismic force for the empty, operating and emergency weights of each cyclone and for the transition. These were applied as horizontal accelerations in both plan directions together with gravity.
Thermal model before the stress model. A steady-state thermal analysis of the shell, refractory and microporous insulation, with the hot gas temperature inside and convection to ambient air outside, gave the shell temperature. Temperature-dependent modulus, expansion and conductivity of SA 516 Grade 70 were taken from ASME Section II Part D, and the allowable stress at the resulting design temperature was used for the checks.
Solid FE model of each item. The cyclone barrel, cone, outlet tube, support lugs and flanges were modelled from the supplied 3D geometry and meshed with second-order tetrahedral and hexahedral solid elements, with at least two elements through the plate thickness. The global element size was fixed by a mesh convergence study. The cyclones were restrained at the support lugs, and the operating and emergency weights were placed at the positions shown on the drawings.
Twenty load cases. Each cyclone was run for empty, operating and emergency weight with seismic load in each horizontal direction. The transition was run in its operating position and then as a cantilever, fixed in turn at the circular flange and at the rectangular flange, with and without seismic load, at the shutdown temperature.
Code check by stress linearisation. The highest stresses were at the support lug to shell junction on the cyclones and at the flange to shell junction on the transition. At these sections the stress was linearised through the thickness into membrane and membrane plus bending parts, and checked against the ASME VIII Division 2 Part 5 limits for protection against plastic collapse. The governing case for each cyclone and for the transition met these limits.
Centre of gravity and review loop. The report gives the centre of gravity of each cyclone for the empty, operating and emergency weights, and of the transition. When the owner's engineers asked how the axes were oriented and whether the operating centre of gravity included the vessel's own weight, we marked the axes on the models and reissued the centre of gravity for the operating and emergency cases with the self-weight included. The transition was re-modelled at its new length and the cantilever cases were added to answer the flange question.
Common questions
How are seismic loads calculated for a cyclone or other equipment inside a building in Canada? Under NBC 2015 the equipment is treated as an operational and functional component. Its lateral force depends on the site spectral acceleration, the importance factor, the component's flexibility category and its height within the building, multiplied by the equipment weight. Each weight condition (empty, operating, emergency) gives its own force.
Why run a thermal analysis before a seismic stress check on a hot vessel? The allowable stress of carbon steel plate drops as its temperature rises. A thermal model of the refractory and insulation gives the actual shell temperature, so the ASME allowable used in the stress check matches the metal temperature in service and not the gas temperature or room temperature.
Challenges we overcame
Hot, refractory-lined shells where temperature cuts the allowable stress
Three weight conditions per cyclone, each with its own seismic force
Support lugs carrying both gravity and lateral seismic load
An inlet transition that can be held at one flange as a cantilever
Centre of gravity needed by others to design the supporting steel
Late change to the transition length during the owner's review
How we executed
- 1
Took the 3D models, weights and drawings of both cyclones and the transition
- 2
Calculated NBC 2015 seismic forces for empty, operating and emergency weights
- 3
Ran a steady-state thermal model of shell, refractory and insulation
- 4
Set temperature-dependent SA 516 Gr 70 properties and allowables from ASME II-D
- 5
Meshed each item with second-order solids, sized by a convergence check
- 6
Solved twenty weight and seismic load cases, including the cantilevered transition
- 7
Linearised stresses at the lug and flange junctions and checked them to ASME VIII-2 Part 5
- 8
Reported centres of gravity and revised the report after the owner's review
Project outcome
Both cyclones and the inlet transition met ASME VIII Div 2 Part 5 limits in their governing load cases.
Support lugs confirmed for the emergency weight combined with seismic load.
Seismic design forces for each weight condition handed over for the supporting steel design.
Centres of gravity for empty, operating and emergency conditions issued, including self-weight.
Flange shown adequate to hold the longer transition as a cantilever.
Owner's review questions answered and a revised report issued.